Eastern Shore Drive – Phase I

Projects to improve stormwater management and relieve widespread flooding in Lynnhaven Colony, Shore Drive and Cape Story by the Sea neighborhoods. 

Eastern Shore Drive - Elevate Lynnhaven Drive $3,600,000

Construction of roadway and drainage improvements along West Great West Neck Road, Ebb Tide Road, and Lynnhaven Drive. 

Eastern Shore Drive - Phase I, Section 1F Improvements $1,560,000
Flood control drainage improvements to include, but are not limited to, acquisition, stormwater collection systems, outfall systems, and backflow prevention device within the Eastern Shore Drive area, roughly between Starfish Road to Ebb Tide Road on the north side of Shore Drive. 

Eastern Shore Drive - Phase I, Section 1G Improvements $940,000

Flood control drainage improvements to include, but are not limited to, acquisition, stormwater collection systems, roadway, curb and guttering work, outfall systems, and backflow prevention devices within the Eastern Shore Drive area, roughly just east of Jade Street to West Neck Road, along the south side of Cape Henry Drive. 

Eastern Shore Drive - Poinciana Pump Station $8,200,000

Replacement of the 40+-year old Poinciana Stormwater Pump Station located on the south side of Poinciana Drive between Bayberry Street to the east and Sandalwood Road to the west. 