These fees are applicable to single-family dwellings, duplexes, triplexes and mixed-use buildings** having both residential and non-residential uses.  
Capital Recovery Fee - single-family dwellings, duplexes, triplexes and mixed-use buildings
Water Meter Size
Water Capital
​Recovery Fee
Sewer Capital
Recovery Fee*
(City Installed Sewer)
Sewer Capital
Recovery Fee
(Developer Installed Sewer)
5/8
$ 2,267
$ 1,545
$ 387
1
$ 5,667
$ 3,863
$ 966
1.5
$ 11,333
$ 7,727
$ 1,932
2
$ 18,133
$ 12,363
$ 3,091
3
$ 34,000
$ 23,181
$ 5,796
4
$ 56,667
$ 38,364
$ 9,659
6
$ 113,334
$ 77,268
$ 19,317
8
$ 181,334
$ 123,629
$ 30,908
10
$ 260,668
$ 177,717
$ 44,430
 
The below fees are applicable to multi-family dwellings on a master meter. 
Capital Recovery Fee - multi-family dwelling with a master meter
Water Capital
​Recovery Fee
Sewer Capital
Recovery Fee*
(City Installed Sewer)
Sewer Capital
Recovery Fee
(Developer Installed Sewer)
Per Unit
$ 1,587
$ 1,082
$ 271
 
In certain instances, a percentage of the applicable capital recovery fees shall apply:
Sanitary sewer gravity service unavailable
50% sewer fee only
Year-round campgrounds
100%
Seasonal campgrounds
50%
​​
* For a property connected to public sewer, but not to the public water system, the appropriate fee shall be assessed according to the water meter size that would be necessary to serve the property.
 
** Mixed-use buildings with residential and non-residential components are required to be metered separately. 
 
Crediting of Previously Paid Connection Fees
Where a property is redeveloped, connection fees will be credited for existing water and sewer connections.
 
In the case that the water meter size is increased from what previously existed, the difference in the water and sewer capital recovery fees shall be due.
 
In the case where the water meter size is decreased from what previously existed, the credited fees shall be applied to any newly assessed fees and no refund will be issued for a surplus in credit.
​​
Contact Information