Status update as of August 2020: The renovated parking lot, new playground, shelter, backstop, dugout shelters, lavatory enclosure, and the field light pole have been installed. The concrete basketball court, bleacher pads, perimeter fencing/timber guard rail, field lights, and the player benches/bleachers will be installed within the next two months.
Newlight Proposed Improvements and Amenities:
• Playground System
• Lighted Ball Field/Football
• Expanded Parking Lot
• Basketball Court
• ADA compliant concrete walkways leading from parking lot to the playground, basketball court and ball field.
• Timber Guard Rail
• Bleachers & Player Benches
• Dugout Shelters
• Lavatory Shelter
• ADA compliant 8‘ long aluminum picnic table with a 15x15 prefabricated picnic shelter
• Aluminum bike rack on a new concrete pad
• Handicapped Accessible Parking Spaces
For questions about the proposed park renovations, contact Brian Phelps at (757) 385-1319 or
bkphelps@vbgov.com.