Violet Bank Trail

Violet Bank Trail is within the existing Violet Bank Drive ROW and includes the construction of a sidewalk where it currently terminates on Kittery Drive, then we will transition to constructing a shared-use path all the way to Selwood Drive.

​Project Details

  • VDOT TAP Grant Awarded late 2018 with authorization to proceed granted in 2019
  • The final scope of work is currently under review
  • Initial survey work has been completed
  • The design phase will take place in 2021
  • Construction is anticipated to begin by early Summer 2022